← Overrides that needed a leader

Override detail

OVR-202608-0087

TRAILER_RESEQUENCE · building BLD-4417 · 2026-08-20 · twilight shift · decided at L4

ESCALATE

What the shift leader did

Decision type
TRAILER_RESEQUENCE
From
SEQ-19
To
SEQ-13
Quantity moved
4
Reason code
WEATHER
Forecast confidence
88.7%
Downstream capacity
62.6%
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
95.1%
Notes
Recovered within the shift.

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass8,8707,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floortrailer-resequence-capacity-gatedfail6,2608,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-2f37cb75-416a-4d76-8fa8-798b8fe338e9
Position in chain
98
Record hash
c4edad94bd35ee8e863c1bf82d727033c313f64b75fffa2cbb92d124a7670d81
Previous record hash
f8934c3e8d86f73944c7d86048d60e882a26e938030ecd0cdb9f4f934a66743d
Input hash
d83f468c3740a19aa66e710cbbb18191bbc8cbbce4972dc7b770b30b3d9932be
Rules hash
9faa3b6f3dde1fbfb61fb4447c6aa0d63bcdd9190ec217246dae027155f62890
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.