← Overrides that needed a leader

Override detail

OVR-202608-0088

TRAILER_RESEQUENCE · building BLD-4417 · 2026-08-08 · night shift · decided at L6

ESCALATE

What the shift leader did

Decision type
TRAILER_RESEQUENCE
From
SEQ-1
To
SEQ-19
Quantity moved
4
Reason code
WEATHER
Forecast confidence
77.3%
Downstream capacity
74.9%
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
95.0%
Notes
Absorbed by the following wave.

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass7,7307,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floortrailer-resequence-capacity-gatedfail7,4908,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-b1a82f31-5c07-4b7b-8b78-33c3adca98fd
Position in chain
37
Record hash
9a6e6a31a1bd45a4fbbb93c274362251261c52b80fbeeeec3db9a20695592222
Previous record hash
01b2d042eb9fc6517439452ffeb4b4a956c09e36bc59dad4c352ab14ff5c4f22
Input hash
f37f5a0dd5413e5c1be563e8a1674824fda82df61df0e0e54cddc8af5e72ef46
Rules hash
9faa3b6f3dde1fbfb61fb4447c6aa0d63bcdd9190ec217246dae027155f62890
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.