← Overrides that needed a leader

Override detail

OVR-202608-0091

TRAILER_RESEQUENCE · building BLD-4417 · 2026-08-20 · day shift · decided at L7

ESCALATE

What the shift leader did

Decision type
TRAILER_RESEQUENCE
From
SEQ-18
To
SEQ-7
Quantity moved
4
Reason code
SYSTEM_OUTAGE
Forecast confidence
84.1%
Downstream capacity
79.9%
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
92.6%
Notes
Plan restored by cutoff.

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass8,4107,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floortrailer-resequence-capacity-gatedfail7,9908,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-f8cc3379-2663-49d8-aefa-435316187adb
Position in chain
99
Record hash
5779f8f5dcc0aad6559fa2cd91f19a74eef8b8783f240449178ac322fd5c49f8
Previous record hash
c4edad94bd35ee8e863c1bf82d727033c313f64b75fffa2cbb92d124a7670d81
Input hash
c2ac0a5f23eb65b451aadb1ca2356d58287631ef70df1fd2f155d79584bbd211
Rules hash
9faa3b6f3dde1fbfb61fb4447c6aa0d63bcdd9190ec217246dae027155f62890
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.