← Overrides that needed a leader

Override detail

OVR-202608-0095

TRAILER_RESEQUENCE · building BLD-4417 · 2026-08-09 · night shift · decided at L6

ESCALATE

What the shift leader did

Decision type
TRAILER_RESEQUENCE
From
SEQ-17
To
SEQ-20
Quantity moved
1
Reason code
STAFF_CALLOUT
Forecast confidence
93.9%
Downstream capacity
64.9%
Minimum staffing intact
yes

What happened to the stores

Replenishment
missed
On-time
92.7%
Notes
Missed cutoff on the outbound wave.

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass9,3907,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floortrailer-resequence-capacity-gatedfail6,4908,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-01d93eed-7942-4832-af1a-72b6a84968a9
Position in chain
43
Record hash
97cacef6100d8a3b784ebd68bbc3a04dda964d41fae3fc6af55529e37f9d9f84
Previous record hash
0f2e55d1de6daa4ec25e89e90cda01e80fb24e1c2d45a705161902b01afb0dd6
Input hash
18cd27991dba63cb29ce50b8fd1164469b450c20e4a624a4d7de43fa516cd9b3
Rules hash
9faa3b6f3dde1fbfb61fb4447c6aa0d63bcdd9190ec217246dae027155f62890
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.