← Overrides that needed a leader

Override detail

OVR-202608-0108

TRAILER_RESEQUENCE · building BLD-4417 · 2026-08-10 · twilight shift · decided at L6

ESCALATE

What the shift leader did

Decision type
TRAILER_RESEQUENCE
From
SEQ-4
To
SEQ-5
Quantity moved
4
Reason code
SYSTEM_OUTAGE
Forecast confidence
85.7%
Downstream capacity
74.9%
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
93.1%
Notes
No downstream impact observed.

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass8,5707,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floortrailer-resequence-capacity-gatedfail7,4908,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-0ea3a828-051a-4e4f-bf57-96fcb1fd5656
Position in chain
51
Record hash
b9219400c9ef36c42b26413bb90e9eba8f708139a91570987b6b5a9df8c1859a
Previous record hash
34e9a4e7a0a1d1a9bc8290dfc8edd5228ee46596df946ba94d6e280cae1e4230
Input hash
2d846bd6b6338c13ff3e6502d2f75306fa20162a39bc57ac4357cf480f833047
Rules hash
9faa3b6f3dde1fbfb61fb4447c6aa0d63bcdd9190ec217246dae027155f62890
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.