← Overrides that needed a leader

Override detail

OVR-202608-0116

DOCK_ZONE_ASSIGNMENT · building BLD-4417 · 2026-08-18 · twilight shift · decided at L6

ESCALATE

What the shift leader did

Decision type
DOCK_ZONE_ASSIGNMENT
From
DOCK-18
To
DOCK-01
Quantity moved
3
Reason code
FORECAST_MISS
Forecast confidence
85.4%
Downstream capacity
80.8%
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
92.7%

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass8,5407,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floordock-zone-assignment-capacity-gatedfail8,0808,500downstream_capacity_below_floor
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-f5b69991-1769-4182-8ac1-54be82933ed7
Position in chain
93
Record hash
90c2882e1ce7d8027872489b86da663419b15d599e087ad3396ad205db913eb4
Previous record hash
0489707f84f589c48651a43bc49296e1daaf879289cb25342c5370fd59cb687e
Input hash
1e5485edcb763d20b4b67877f552bc6daa51975efac6c360822d3532888adf05
Rules hash
867cebe79facbba430bde8e7f77a98edb4fd4ab88bbbf35396df259bbf4c48cd
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.