← Overrides that needed a leader

Override detail

OVR-202608-0118

DOCK_ZONE_ASSIGNMENT · building BLD-4417 · 2026-08-09 · night shift · decided at L5

ESCALATE

What the shift leader did

Decision type
DOCK_ZONE_ASSIGNMENT
From
DOCK-14
To
DOCK-18
Quantity moved
4
Reason code
STORE_PRIORITY
Forecast confidence
93.3%
Downstream capacity
Minimum staffing intact
yes

What happened to the stores

Replenishment
no miss
On-time
96.6%

Constraint evaluation trace

The constraints in the order the policy evaluated them. Every constraint is evaluated even after one fails, so the whole picture is on the record; the first failure is the one that decides the verdict. Read from the signed payload.

#ConstraintRuleOutcomeObservedLimitReason code
1Minimum staffing intacthard-constraint-min-staffingpass11
2Forecast confidence at or above floorforecast-confidence-floorpass9,3307,000
3Decision type covered by a ruleuncovered-decision-typepass
4Downstream capacity at or above floordock-zone-assignment-capacity-gatedfail8,500downstream_capacity_not_recorded
Verdict ESCALATE — decided by Downstream capacity at or above floor. Policy flow-center-v1.

Tamper-evidence

Record class
retrospective_evaluation_record
Proof id
proof-ee8e3eae-b9a3-4bef-b70d-6e71d826dce8
Position in chain
44
Record hash
82cc7112a11441cc845a7613c2abe75f3f4ffcde6fe36cd7b5fadffe8fedda20
Previous record hash
97cacef6100d8a3b784ebd68bbc3a04dda964d41fae3fc6af55529e37f9d9f84
Input hash
21c9a9d26041129de88d364f13bb02a6e8c96a118157da88dda62d782a9c3e2c
Rules hash
a6855b8bcd1f0a69a6a448eab8a879ce5a08031b84f13cfab0caeb254729b3c6
Signature
present (Ed25519)
Workflow
Flow-Center Operating Overrides Replay
Policy applied
Flow-Center Operating Policy · flow-center-v1
Sealed at
2026-09-16 03:57:35 UTC
Stored disposition
escalate

Verification is independent of the screen you are looking at: it recomputes the record from its own contents, checks the signature, and rehashes the payload against the input hash bound into the signed core.