Radien
Decision detail
DEC-202608-0752
TRAILER_DISPATCH · RDC-03 · store STR-032 · 2026-08-26
Plan and actor
- Plan reference
- PLAN-RDC-03-W35-0752
- Policy version
- plan-conformance-v1
- Source
- seeded dataset
- Actor
- ALLOCATION_ALGORITHM
- Actor type
- ALGORITHM
- Approver
- —
- Required approver
- TRANSPORTATION_MANAGER
- Category
- FOOD
- Actual trailer fill
- 80.0%
- Planned units
- —
- Actual units
- —
- Outside planned window
- —
- Hold hours
- —
Outcome
Estimated transport cost per unit is synthetic. In-stock is the following three days at the store, for this category.
- 3-day in-stock
- 93.3%
- Trailer fill
- 80.0%
- Estimated transport cost per unit
- $1.50
Constraint trace
Every check was evaluated. The first failure is Trailer fill in the transportation-manager band.
- 1Decision type covered by a rulepassobserved — · limit —
- 2Trailer fill recordedpassobserved 80.0% · limit —
- 3Trailer fill at or above the prohibition floorpassobserved 80.0% · limit 60.0%
- 4Trailer fill in the director bandnot_applicableobserved 80.0% · limit 75.0%
- 5Trailer fill in the transportation-manager bandfailobserved 80.0% · limit 85.0%approval_missing
- 6Trailer fill within plannot_applicableobserved 80.0% · limit 85.0%
Record
- Proof id
- proof-e5edf324-d190-4300-9d7e-9c48309521c4
- Record hash
- 7063358cd1f656ec05a5b6210cd7aa960c5843265f77d985d6c4c51b5ac73c97
- Previous hash
- f3213ac881355db1e9803f521958e4df783a0c5a3d84f99f8fbe093bae5037cf
- Signature
- signed
- Signing method
- ed25519
- Column disposition
- flag
- Workflow
- Plan Conformance Replay